Roland LEC-330 Guida di Configurazione Pagina 34

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 68
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 33
3. Assembling and Installing
32
Step 4: Remove the Packing Materials
Packing materials are attached to the machine to protect it from vibration during transportation. When
installation is complete, remove them.
Remove all packing materials. Any that remain may cause faulty operation or breakdown
when the power is switched on.
Store the packing materials carefully, because they are needed again when transporting the
machine for relocation or the like.
Packing material
RemoveRemove
Peel off the tape.
Peel off the tape.
Vedere la pagina 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 67 68

Commenti su questo manuale

Nessun commento